01
Set a clear tenant interface
Document the provision for each unit, the tenant’s information obligations and the approval path for changes. Coordinate shopfronts, service connections and equipment requirements with the base-building design before fit-out begins.
02
Sequence public and service areas
Loading, waste handling, parking and common circulation need to work alongside retail spaces. Review the construction sequence for these areas and identify which must be ready before tenants can access or operate their units.
03
Track readiness for opening
Build a milestone plan covering utilities, systems testing, tenant works and defect closure. Separate commercial target dates from verified construction forecasts. Where progress slips, use evidence from the critical packages to prioritise recovery decisions.